Pool construction 2018

We’ve been having a saltwater pool installed in the backyard.  They should have been done by now, but we’ve been having rain every week since they started.  It takes about 3 weeks to complete, but they’ve only been able to work 3 days each of the past 3 weeks.  They are ready to pour the concrete around the sides and install the pump, etc.  Depending on rain, they should be done this week.

 

 

 